- Disconnect a negative wire from the battery.
- On engines with низконапорным a turbo-supercharging (X20DTL/Y20DTL) remove a metal tube and an air line connecting the inlet pipeline with турбокомпрессором. On engines with high pressure pressurisation (Y20DTH) remove an air line connecting the pipeline with intercooler.
|
- Turn out screws of fastening of a routeing trench of electroconducting to the top part of the inlet pipeline. Release clamps of sockets and disconnect electroconducting from temperature gauges, Fuel pump, gauge CKP and the gauge of pressure of pressurisation.
|
|
- Take a trench aside from the pipeline.
|
|
- Disconnect a vacuum tube from valve EGR on the top part of the inlet pipeline.
|
|
- Carefully wipe штуцерные sockets and disconnect fuel tubes from atomizers and Fuel pump, - at отпускании nuts hold reciprocal parts of sockets Fuel pump with the second рожковым a key. For the purpose of minimisation of losses of fuel and in order to avoid hit in the dirt power supply system at once закупорьте the open ends of fuel lines and штуцерных sockets.
|
A.
B. |
- Gradually and in regular intervals having weakened, turn out fixing bolts and cautiously remove the top part of the pipeline, - the sealing lining is subject to replacement without fail.
|
|
- For removal of the bottom section of the pipeline, disconnect a vacuum tube from диафрагменной assemblages of the valve of switching of the pipeline.
|
|
- Turn out fastening bolts to the pipeline of a basic arm of a socket of electroconducting.
|
|
- In regular intervals and gradually having weakened, give fixing nuts and remove the bottom section of the pipeline from a head of cylinders, - the sealing lining is subject to replacement without fail.
|
|
- Make sure of absoluteness of cleanliness and dryness of interfaced surfaces.
|
- Lay a new lining on a head of cylinders, then establish the bottom section of the pipeline. Screw new fixing nuts and in a diagonal order in stages in regular intervals tighten them with demanded effort. Attach a valve-switch hose establish a basic arm of electroconducting.
|
|
- Lay a new lining on the top cut of the bottom section, and establish the top section the pipeline. Tighten with demanded effort fixing bolts.
- Establish fuel tubes, - track, that nuts штуцерных sockets have been tightened with demanded effort.
- Establish on the pipeline a routeing trench of electroconducting, reliably tighten fixing bolts and restore initial connection of electroconducting. Connect a vacuum tube to valve EGR.
- Establish an inlet air line / a tube (Removal and installation of components of an inlet air path see). Establish on a head of cylinders a plastic protective casing.
- Connect a negative wire to the battery.
|